HVAC ductwork fabrication and installation

Fabrication and installation of supply, return, fresh-air and exhaust ductwork, with leakage testing.

Service reference M-05

How is HVAC ductwork installed?

HVAC ductwork is installed from coordinated shop drawings: sections are fabricated to the specified gauge and construction standard, hung on supports at the required spacing, sealed at joints, fitted with dampers and access panels, leakage-tested, insulated where required and connected to air terminals before the system is balanced.

Ductwork is where coordination problems show up first. It is the largest service in most ceiling voids and the least flexible to reroute once installed.

White Arch fabricates and installs ductwork to the project specification and the construction standard it references, and tests it before it is concealed.

Scope of work

  • Ductwork shop drawings and coordination
  • Galvanised steel duct fabrication
  • Supply, return, fresh-air and exhaust ductwork
  • Supports, hangers and seismic or vibration provisions as specified
  • Volume control dampers, fire dampers and access doors
  • Flexible connections and air terminals
  • Duct leakage testing
  • Thermal and acoustic insulation
  • Air balancing support

How we deliver

Built to the referenced standard

Gauge, joints, sealing and support spacing follow the standard named in the specification, commonly SMACNA or DW/144.

Tested before concealment

Leakage tests are carried out on sections before insulation and ceilings close, with results recorded.

Protected on site

Open duct ends are sealed during construction to keep dust out of the system and the occupied space.

UAE project context

Duct leakage in the UAE climate wastes cooling energy and can cause condensation where warm, humid air meets cold surfaces. Sealing and insulation quality directly affect both energy use and ceiling damage risk.

Frequently asked questions

Why does duct leakage testing matter?

Leaking ducts lose conditioned air before it reaches the space, increase fan energy and can cause condensation. Testing confirms the ductwork meets the leakage class in the specification.

Do you fabricate ductwork in-house?

Our ductwork capability and fabrication arrangements are confirmed during tender clarification so that capacity matches the project programme.