What is the difference between a CCU and a CRAC unit?

A CRAC (computer room air conditioner) is a precision cooling unit with its own refrigerant compressor, usually paired with an outdoor condensing unit. A Close Control Unit (CCU) is the general term for precision air conditioning units that hold temperature and humidity within tight limits; they can be direct-expansion (like a CRAC) or chilled water units that use water from a chiller plant.

Precision cooling units keep data centres, server rooms and control rooms within tight temperature and humidity limits around the clock. Installing or replacing them involves heavy, sensitive equipment, refrigerant or chilled water connections, electrical and controls interfaces, and very little tolerance for downtime.

White Arch has installed CCUs for data centres in the UAE, including CCU installation with data centre preparation, chilled water piping, new copper piping, civil and raised-floor works, electrical power works and machine start-up for the Al Bustan Office Tower data centre, CCU supply, installation and commissioning with complete associated MEP works for the MOPA Admin Building, and chillers, pumps and CCUs for the NCMS Data Centre in Mafraq.

Scope of work

  • Close Control Unit (CCU) installation
  • CRAC unit installation
  • Replacement of existing precision cooling units
  • Indoor unit positioning and installation
  • Outdoor condensing unit installation and relocation
  • Crane lifting and rigging coordination
  • Refrigerant copper piping extensions and modifications
  • Refrigerant piping pressure testing
  • Nitrogen purging and system evacuation
  • Electrical power and isolator connections
  • Cable trays and containment
  • Condensate drainage
  • Controls integration where applicable
  • Testing, commissioning and equipment start-up coordination

How we deliver

Survey before replacement

Existing units, piping routes, electrical supplies and floor loadings are surveyed so the new units fit the space and infrastructure.

Refrigerant discipline

Copper piping is brazed with nitrogen purge, pressure-tested and evacuated before charging, protecting the compressors.

Continuity

Replacements are phased against the room's redundancy, with temporary cooling where the design requires it.

UAE project context

Outdoor condensing units in the UAE operate in very high ambient temperatures and dust. Their location, spacing and protection from recirculating hot air are checked as part of every installation or relocation.

Frequently asked questions

What is involved in replacing precision cooling equipment?

Survey, isolation and decommissioning of the existing unit, refrigerant recovery or chilled water isolation, removal, positioning of the new unit, piping, power, drainage and controls connections, testing and start-up, all planned around the room's redundancy.

How are outdoor condensing units relocated?

The new position is checked for airflow and structure, the unit is isolated and its refrigerant recovered, it is rigged and moved, the refrigerant piping is extended or rerouted, pressure-tested and evacuated, then the unit is recharged and restarted.

How are refrigerant piping extensions executed?

With correctly sized copper, brazed under nitrogen purge, supported and insulated, then pressure-tested with nitrogen and evacuated to a deep vacuum before charging to the manufacturer's figures.

What electrical and controls interfaces are needed?

A dedicated power supply with isolator, connections from the indoor to the outdoor unit, alarm and monitoring connections to the BMS where specified, and leak detection where provided.

Can CCUs be replaced in an operating data centre?

Yes, with phased works, redundancy maintained and, where needed, temporary cooling, agreed with the facility team in a method statement.

White Arch engineers directing a chiller lift

✦ / Start a conversation

Planning an HVAC or MEP Project?

New installations, system replacements and complex retrofits, from an empty drawing to a commissioned system. Share your drawings, BOQ or requirement with our engineering team.

Direct line +971 2 643 7371 · info@whitearch.ae