Chilled-water system installation

Chilled-water distribution, AHU and FCU installation, and connections to chiller plants or district cooling.

Service reference M-02

What is a chilled-water HVAC system?

A chilled-water system cools a building by circulating chilled water, produced by a chiller plant or supplied by a district cooling network, through insulated pipes to air handling units and fan coil units. The units transfer heat from the air into the water, which returns to the plant to be cooled again.

Chilled-water systems serve most large commercial, hospitality, institutional and mixed-use buildings in the UAE. Their performance depends heavily on installation quality: pipe sizing as designed, correct valve and strainer arrangements, clean pipework and a properly balanced hydronic network.

White Arch installs the complete secondary system from the plant room or energy transfer station to the terminal units, and hands it over flushed, tested, balanced and documented.

Scope of work

  • Chilled-water supply and return piping, risers and branches
  • AHU, FAHU and FCU installation and connection
  • Pumps, valves, strainers, balancing and control valves
  • Expansion, make-up and air-separation equipment
  • Interfaces with district cooling energy transfer stations
  • Pipe insulation, vapour barrier and cladding
  • Hydrostatic pressure testing
  • Flushing, cleaning and chemical treatment coordination
  • Hydronic balancing and commissioning

How we deliver

Clean systems

Debris left in pipework is the most common cause of blocked strainers and coils. We follow a defined flushing and cleaning procedure before terminal units are brought online.

Insulation done right

In UAE humidity, gaps in the vapour barrier lead to condensation, corrosion and ceiling damage. Insulation is inspected before ceilings close.

Balanced flow

Flow to each unit is measured and set to design values so that the building receives the capacity it was designed for.

UAE project context

Many developments in Abu Dhabi and Dubai are served by district cooling. In these buildings the contractor's scope usually starts at the energy transfer station, and coordination with the district cooling provider's requirements for connection, testing and water quality is part of the work.

Frequently asked questions

Is a chilled-water system better than VRF?

Neither is better in every case. Chilled water generally suits large buildings and campuses with central plant or district cooling, while VRF often suits small to mid-size buildings and phased fit-outs. Our article on chilled water versus VRF compares them in detail.

Why is flushing important before commissioning?

Construction debris and scale in new pipework block strainers, control valves and coil tubes. Proper flushing protects equipment and allows the system to be balanced to its design flow.