Data Centre MEP Contractors and Precision Cooling Installation in the UAE

MEP installations and precision cooling for data centres and server rooms: chillers, CCU/CRAC units, chilled water and refrigerant piping, raised floors, power and controls.

Service reference DC-01

What MEP works does White Arch carry out for data centres?

White Arch carries out the mechanical, electrical and cooling installation works for data centres and server rooms in the UAE: chiller preparation and replacement, Close Control Unit (CCU) and CRAC unit installation, chilled water and refrigerant piping, raised-floor and data centre preparation works, standby backup VRF and DX cooling, electrical power and isolator connections, cable containment, drainage, controls interfaces, testing and commissioning, often inside operational facilities.

In a data centre, cooling is as critical as power: a short loss of cooling can force IT equipment to shut down. Cooling works therefore have to be planned around redundancy, isolation and operational continuity, and installed without shortcuts.

White Arch has delivered data centre and critical cooling projects across Abu Dhabi, including chiller preparation works for data centres at Al Khazna, CCU installation with raised-floor, chilled water, copper piping and electrical works for the Al Bustan Office Tower data centre, complete HVAC works including chillers, pumps and CCUs for the NCMS Data Centre in Mafraq, chiller replacement for the UPC data centre, standby backup VRF for the FAB Data Centre at KIZAD and server room HVAC for National Bank of Kuwait. We work directly for owners and as cooling contractor for international HVAC manufacturers and IT infrastructure integrators.

Our scope is the MEP and cooling installation works. Data centre IT infrastructure, UPS systems and overall mission-critical design are provided by the client's specialist designers and suppliers; we coordinate our works with them.

Scope of work

  • Chiller set-up, preparation, installation and replacement
  • Chilled water pumps, piping, valves and harmonic filter connections
  • Close Control Unit (CCU) and CRAC unit installation and replacement
  • Refrigerant copper piping installation, extensions and modifications
  • Standby backup VRF and DX cooling for server rooms
  • Raised floor and data centre preparation works
  • Equipment relocation, positioning, rigging and crane lifts
  • Electrical power, isolators, cable trays and containment
  • Condensate drainage connections
  • Controls and BMS interface works where specified
  • Pipe Freezing and Hot Tapping for works on live chilled water systems
  • Testing, commissioning and equipment start-up

How we deliver

Operational continuity

Works are sequenced around the facility's redundancy so that cooling capacity is maintained while equipment is replaced or connected.

Method statements and permits

Detailed method statements, risk assessments and permits are agreed with the facility team before any isolation or lift.

Clean, tested systems

Refrigerant piping is nitrogen-purged, pressure-tested and evacuated; chilled water connections are flushed and tested before units are started.

Coordinated start-up

Units are started up with the manufacturer and tested with their controls and alarms before handover.

UAE project context

In the UAE climate, data centre cooling plant works against outdoor temperatures above 45°C in summer, so equipment selection, condenser airflow and spacing are critical. Server inlet conditions are normally designed to the ASHRAE thermal guidelines for data processing environments, whose recommended envelope is 18 to 27°C at the server inlet.

Frequently asked questions

Has White Arch carried out data centre projects?

Yes. Our projects include chiller preparation works for data centres at Al Khazna, CCU installation at the Al Bustan Office Tower data centre, CCU works for the MOPA Admin Building, HVAC works for the NCMS Data Centre in Mafraq, the UPC data centre chiller replacement, standby backup VRF for the FAB Data Centre at KIZAD, and server room HVAC for National Bank of Kuwait. Photographs are not published for confidentiality.

Can cooling be upgraded while the data centre is running?

Yes, with redundancy, phased works and live-system techniques such as Pipe Freezing and Hot Tapping that avoid draining or shutting down the chilled water system.

Do you supply UPS systems or IT infrastructure?

No. Our scope is the mechanical, electrical and cooling installation works. We coordinate with the specialists who provide UPS, IT and overall data centre design.

Do you work as a subcontractor to HVAC manufacturers and IT integrators?

Yes. Several of our data centre projects were delivered as the cooling and MEP installation contractor for international HVAC manufacturers and IT infrastructure integrators.

Do you provide maintenance for data centre cooling?

Yes, through planned preventive maintenance and annual maintenance contracts.

White Arch engineers directing a chiller lift

✦ / Start a conversation

Planning an HVAC or MEP Project?

New installations, system replacements and complex retrofits, from an empty drawing to a commissioned system. Share your drawings, BOQ or requirement with our engineering team.

Direct line +971 2 643 7371 · info@whitearch.ae