Data Centres

Precision cooling, chilled water infrastructure, CRAC/CRAH units and MEP works for data centres and server rooms.

01 / Sector

Data Centres in the UAE

Data centres and server rooms need cooling that never stops. White Arch delivers the MEP and cooling works behind them: chiller preparation and replacement, CCU installation, chilled water and refrigerant piping, raised-floor works, standby backup VRF and DX cooling, electrical power and controls. Our data centre projects include chiller preparation works for data centres at Al Khazna and standby backup VRF for the FAB Data Centre at KIZAD (for Trane Technologies), CCU installation at the Al Bustan Office Tower data centre, CCU works for the MOPA Admin Building, complete HVAC works for the NCMS Data Centre in Mafraq and chiller replacement for the UPC data centre in Abu Dhabi (for Cell Information Technology), HVAC for the simulator room in the Abu Dhabi Airport Air Traffic Control Complex (for Bayanat) and server room HVAC for National Bank of Kuwait. Project photographs are not published for confidentiality.

What MEP works does White Arch carry out for data centres?

White Arch carries out the mechanical, electrical and cooling installation works for data centres and server rooms in the UAE: chiller preparation and replacement, Close Control Unit (CCU) and CRAC unit installation, chilled water and refrigerant piping, raised-floor and data centre preparation works, standby backup VRF and DX cooling, electrical power and isolator connections, cable containment, drainage, controls interfaces, testing and commissioning, often inside operational facilities.

Scope we deliver

  • Chiller set-up, preparation, installation and replacement
  • Chilled water pumps, piping, valves and harmonic filter connections
  • Close Control Unit (CCU) and CRAC unit installation and replacement
  • Refrigerant copper piping installation, extensions and modifications
  • Standby backup VRF and DX cooling for server rooms
  • Raised floor and data centre preparation works
  • Equipment relocation, positioning, rigging and crane lifts
  • Electrical power, isolators, cable trays and containment
  • Condensate drainage connections
  • Controls and BMS interface works where specified
  • Pipe Freezing and Hot Tapping for works on live chilled water systems
  • Testing, commissioning and equipment start-up

Data Centre MEP & Precision Cooling

White Arch engineers directing a chiller lift

✦ / Start a conversation

Planning an HVAC or MEP Project?

New installations, system replacements and complex retrofits, from an empty drawing to a commissioned system. Share your drawings, BOQ or requirement with our engineering team.

Direct line +971 2 643 7371 · info@whitearch.ae